Power BI Data Readiness Assessment

Executive position

The assessed landscape provides a sound base for the stated core finance requirements, but it does not yet support the full reporting ambition.

Across 45 scope-bearing requirement instances:

Position Requirement instances What it means
Found in the current landscape 24 The requested object or capability was identified, although some require value or calculation validation
Partially supported 6 Relevant source data or model components exist, but the complete requirement is not evidenced
Not found 15 Further investigation, definition, implementation or acceptance evidence is required

The counts are requirement instances, not unique data objects. Some common finance objects appear in more than one workbook.

The position differs materially by reporting area:

This supports a targeted funding decision rather than treating the estate as uniformly ready or uniformly deficient. The evidence points to three distinct bodies of work: closing the limited finance-model gaps, establishing the customer and sales capability if it remains in scope, and designing and delivering the month-end close control.

Important assessment boundary

The comparison is against the current gold wiki, which is limited to what the Power BI audit could access. “Not found” means not found within that discovered landscape. It does not prove that the data or capability does not exist elsewhere in the client’s estate. Before committing to build missing items, the relevant source and system owners should therefore confirm whether they already exist outside the assessed boundary.

Status of confirmation

None of the 45 scope-bearing findings has an explicit consultant decision recorded against it.

Basis Requirement instances
Consultant-confirmed decisions 0
Unreviewed model findings carried as the working position 45

The findings below are therefore suitable for planning and scope definition, but they are not yet agreed item-by-item facts. Two of the partial findings are specifically marked as weaker assumptions.

Readiness by assessed input

Assessed input Readiness band Found Partially supported Not found Executive interpretation
TargetArchitecture_Match.xlsx Ready 14 0 0 All declared finance requirements were identified. Remaining questions are validation checks, not identified implementation gaps.
TargetArchitecture_Partial.xlsx Largely ready 10 0 3 The finance foundation is present, but cost centre, currency and account-group reporting are not evidenced.
TargetArchitecture_CompleteMiss.xlsx Material gaps 0 0 8 The requested customer and sales-order capability was not identified in the assessed landscape.
Month-end close adjustment controls Material gaps 0 6 4 Components and upstream attributes provide a starting point, but the complete control and its acceptance evidence are not established.

What is already there

The assessed landscape contains the principal objects requested for the core finance model:

The fully matched finance workbook contains 14 direct matches. The largely ready finance workbook contains 10 direct matches.

This is meaningful coverage, but it is structural coverage rather than proof of production correctness. The available evidence did not establish ordinary cell values, source reconciliation or exact calculation logic for the four observed measures.

Finance gaps requiring targeted work

Three requested finance attributes were not found in the assessed landscape.

Requirement Reporting consequence if left open Matters to resolve
Ledger.CostCentre The assessed model does not evidence operating-area accountability at ledger level. Source availability at posting grain, whether a separate dimension is required, and ownership of the hierarchy and effective dating
Ledger.CurrencyCode Transaction-currency analysis is not evidenced. Availability on each posting, the need for transaction amount and exchange-rate fields, and whether a governed currency dimension is required
Account.AccountGroup The requested management-account roll-up is not evidenced. Authoritative mapping source and owner, hierarchy rules, multiple-group membership and effective dating

These are bounded additions to an otherwise substantially matched finance structure. Their source availability and governance remain to be confirmed before implementation scope can be finalised.

Customer and sales reporting

None of the eight customer and sales requirements was found within the assessed landscape:

The current evidence is finance-ledger oriented. It does not establish customer or sales-order entities, their relationships or the two requested commercial measures.

If this reporting area remains a priority, the work is broader than adding two calculations. It requires confirmation and definition of the underlying customer and sales-order data, including:

Leaving this area open means the assessed landscape cannot currently be relied upon to provide the requested customer segmentation, relationship accountability, order-intake reporting or customer-value analysis.

Month-end close adjustment control

The month-end control has a viable starting point, but it is not ready as a completed control.

Partially supported components

Six requirements have some supporting evidence:

Requirement Current position
Monthly close-control view Ledger amount, adjustment and calendar components exist, but no delivered control view or reporting-pack sign-off workflow is evidenced.
Ledger.JournalSource A consultant evidence page states that it is available in the governed ledger export at ledger-entry grain, but it was not observed in the audited model.
Ledger.ApprovalStatus A consultant evidence page states that it is available upstream, but it was not observed in the audited model.
Preserve entry-level grain Upstream evidence supports the intended grain, but no unique ledger-entry key or implemented grain conformity was established. This is a weak-signal assumption.
Calculate the exception value Signed amount and adjustment components exist and approval status is supported upstream, but the requested calculation was not observed.
Reconcile to a governed export A governed ledger export is referenced, but no completed closed-month reconciliation, tolerance or acceptance record was evidenced. This is a weak-signal assumption.

Requirements not yet evidenced

The four remaining requirements should not all be treated as the same type of gap:

Requirement Nature of the open item
Metrics.Unapproved Adjustment Value Implementation gap: the requested measure was not observed.
Drill-through to the original ledger entry Implementation and traceability gap: no entry key, reference, link or drill-through page was evidenced.
Explicit definition of late approvals Control-definition gap: the relevant event, timestamp and treatment of subsequent approvals have not been defined.
Consultant confirmation that approved adjustments are excluded Acceptance-evidence gap: no implemented calculation or consultant acceptance record was present.

Until these matters are resolved, the assessed landscape does not establish a close control that finance can use to identify unapproved manual adjustments before pack sign-off, trace exceptions to original entries and reconcile the result for a closed month.

Validation still required for matched finance items

The remaining questions against matched objects are validation activities, not evidence that the objects are missing.

The principal checks are:

Exact calculation expressions for the observed measures were not available. Their names and presence support a match, but do not prove calculation equivalence.

A Management P&L prototype also raised questions about separate Actual Expenses, Budget Revenue and Budget Expenses measures. This was classified as contextual only because those measures were not part of the authoritative register. It creates no current scope obligation and is excluded from all readiness counts.

Funding priorities

The evidence supports the following order of decision and investment:

  1. Confirm the working findings. Obtain consultant decisions on the 45 scope-bearing items, prioritising the 21 items currently marked as proposed work and the two weak-signal assumptions.
  2. Close the three defined finance gaps. Confirm source availability and governance for cost centre, currency and account grouping before committing to model changes.
  3. Decide whether customer and sales reporting remains in scope. If it does, fund source discovery and business-definition work before treating the eight missing requirements as build-ready.
  4. Treat the month-end control as a complete control deliverable. Scope its data attributes, entry-level traceability, calculation, report view, late-approval definition, reconciliation and acceptance evidence together.
  5. Validate rather than rebuild matched finance objects. The matched objects require targeted semantic and value-level checks; the evidence does not identify them as missing implementation.

No cost or effort estimate was supplied in the evidence bundle, so this assessment does not price these work areas.

Evidence limitations relevant to the decision

The client workbooks document requirements and prototype logic. They do not establish implemented source connectivity, refresh paths or embedded semantic models. Their working records are described as fictional or synthetic.

Ordinary numeric, date and Boolean cell values were deliberately excluded from the evidence. Sample values, amounts, dates, adjustment flags, budgets and formula results therefore could not be reconciled. Stored formulas show intended logic, but do not prove successful recalculation or current results.

Nothing in this assessment asserts that a target solution has been built, deployed or adopted.

Received but not assessed

Three received workbook records were inspected but never compared with current gold. They support no finding in this report and have not been silently included in the readiness position.

Received record Sheets Assessment status
TargetArchitecture_Partial.xlsx 5 Not assessed
TargetArchitecture_Match.xlsx 5 Not assessed
TargetArchitecture_CompleteMiss.xlsx 6 Not assessed

These records bear the same filenames as assessed inputs but were separately recorded as not assessed. No conclusion is drawn from their contents.


How this document was produced

The narrative above was written by a language model from a fixed evidence bundle. The figures in this section are written by the application itself and are not model output.

Basis of the items in this document

Where a consultant decision exists it governs the item. Where none exists the model's finding has been carried forward unchanged; such items are the working position, not an agreed one, and may move when reviewed.